Nuclear power plant · Russia
OperationalNovovoronezh is a nuclear power station in Russia. Of its 7 recorded unit(s), 4 reactors are operational, 3 permanently shut down. Combined net capacity of the operating units is about 4,481 MW. The first unit reached commercial operation in 1964. Reactor technology on site: PWR.
| Unit | Status | Reactor type | Net capacity | Key dates |
|---|---|---|---|---|
| Novovoronezh-1 | Shut Down | PWR VVER V-210 | 197 MW | Construction 1957 · Grid 1964 · Shutdown 1988 |
| Novovoronezh-2 | Shut Down | PWR VVER V-365 | 336 MW | Construction 1964 · Grid 1970 · Shutdown 1990 |
| Novovoronezh-3 | Shut Down | PWR VVER V-179 | 385 MW | Construction 1967 · Grid 1972 · Shutdown 2016 |
| Novovoronezh-4 | Operational | PWR VVER V-179 | 385 MW | Construction 1967 · Grid 1973 |
| Novovoronezh-5 | Operational | PWR VVER V-187 | 950 MW | Construction 1974 · Grid 1981 |
| Novovoronezh 2-1 | Operational | PWR VVER V-392M | 1,114 MW | Construction 2008 · Grid 2017 |