Reactor outages and output

Daily unit-level data for 95 U.S. reactors from the Nuclear Regulatory Commission and 63 European reactors from ENTSO-E grid data. U.S. archive covers 2025-08-21 to 2026-11-25.

U.S. units95
U.S. generating88
U.S. at zero power7
U.S. fleet capacity factor91.2%
European units63
European generating47
European output49,114 MW
Archive span462 days

As of 2026-11-25, 88 of 95 reporting U.S. power reactors were generating and 7 were at zero power. The reporting fleet was running at 90.4% of its combined rated output of 92,241 MW.

Units currently at zero power represent 7,008 MW of nameplate capacity. A reactor at zero power is not necessarily in trouble: refuelling outages are planned, happen roughly every 18 to 24 months, and typically last a few weeks.

Over the past year the capacity-weighted fleet capacity factor was 91.2%. Capacity factor is the share of rated output a reactor actually delivered, averaged over the period — it is the single most useful number for comparing how hard reactors are working, because it folds outages, refuelling and reduced-power operation into one figure.

This page covers the United States only, because the U.S. NRC is one of the few regulators publishing daily unit-level power data. Coverage of other countries depends on what their grid operators publish.

Reactors at zero power right now

ReactorSiteDays at zeroCapacity365-day CFLast 90 days
PalisadesPalisades443 days805 MW0%
North Anna-2North Anna81 days907 MW77.3%
Salem-1Salem53 days1,090 MW85.4%
Millstone-3Millstone45 days1,159 MW87.7%
Waterford-3Waterford40 days1,104 MW84.5%
Watts Bar-2Watts Bar19 days1,165 MW94.2%
CooperCooper16 days778 MW81.8%

Running below 90% output

Reduced power can mean a planned power reduction for testing or maintenance, a grid constraint, or a unit ramping back up after an outage.

ReactorPowerCapacity90-day CFLast 90 days
Point Beach-110%497 MW50.9%
River Bend-110%966 MW88.6%
Oconee-150%887 MW70.4%

Highest capacity factor over the past year

#Reactor365-day CFCapacityLongest outage in window
1Arkansas Nuclear One-1 (ANO-1)100%850 MW34 days
2Braidwood-1100%1,120 MW17 days
3Farley-1100%829 MW26 days
4North Anna-1100%907 MW42 days
5Turkey Point-4100%693 MWnone
6Wolf Creek100%1,170 MW44 days
7Beaver Valley-199.9%835 MW40 days
8Calvert Cliffs-299.8%845 MWnone
9Nine Mile Point-199.8%620 MWnone
10Quad Cities-199.8%789 MWnone

All U.S. reporting units

ReactorSitePower90-day CF365-day CFLast 90 days
Arkansas Nuclear One-1 (ANO-1)Arkansas Nuclear One-1 (ANO-1)100%100%100%
Arkansas Nuclear One-2 (ANO-2)Arkansas Nuclear One-2 (ANO-2)100%94.6%84%
Beaver Valley-1Beaver Valley100%100%99.9%
Beaver Valley-2Beaver Valley100%100%91.5%
Braidwood-1Braidwood100%99.8%100%
Braidwood-2Braidwood100%100%94.3%
Browns Ferry-1Browns Ferry100%65.2%89.1%
Browns Ferry-2Browns Ferry100%88.9%96.7%
Browns Ferry-3Browns Ferry100%99%88.6%
Brunswick-1Brunswick100%99.3%85.1%
Brunswick-2Brunswick100%99.6%99.6%
Byron-1Byron95%99%90.2%
Byron-2Byron100%66%91.6%
Callaway-1Callaway100%51.6%86.3%
Calvert Cliffs-1Calvert Cliffs100%99.8%92.2%
Calvert Cliffs-2Calvert Cliffs100%99.6%99.8%
Catawba-1Catawba100%100%92.4%
Catawba-2Catawba100%100%95.6%
Clinton-1Clinton100%97.6%98.8%
Columbia (WNP-2)Columbia (WNP-2)100%100%97.9%
Comanche Peak-1Comanche Peak100%64.9%91.2%
Comanche Peak-2Comanche Peak100%100%92.7%
CooperCooper0%30.8%81.8%
Davis Besse-1Davis Besse100%86.8%88.1%
Diablo Canyon-1Diablo Canyon100%65.8%90.2%
Diablo Canyon-2Diablo Canyon100%97.8%99.5%
Donald Cook-1Donald Cook100%60.4%90.2%
Donald Cook-2Donald Cook100%100%99%
Dresden-2Dresden100%92.8%98.1%
Dresden-3Dresden100%70.3%90.6%
Enrico Fermi-2Enrico Fermi100%99.5%77.2%
Farley-1Farley100%100%100%
Farley-2Farley100%70%92.6%
FitzPatrickFitzPatrick100%73.9%92.6%
Grand Gulf-1Grand Gulf100%99.6%87.1%
H. B. Robinson-2H. B. Robinson100%53.4%88.5%
Hatch-1Hatch100%94.2%83.1%
Hatch-2Hatch100%98.2%97.2%
Hope Creek-1Hope Creek100%99.9%94.8%
LaSalle-1LaSalle100%99.7%89.8%
LaSalle-2LaSalle100%99.7%97.3%
Limerick-1Limerick100%98.9%92%
Limerick-2Limerick100%99.2%99.6%
McGuire-1McGuire100%65.5%89%
McGuire-2McGuire100%100%90.7%
Millstone-2Millstone100%100%86.6%
Millstone-3Millstone0%50%87.7%
MonticelloMonticello100%98.6%80.4%
Nine Mile Point-1Nine Mile Point100%99.5%99.8%
Nine Mile Point-2Nine Mile Point100%99.4%91.7%
North Anna-1North Anna100%100%100%
North Anna-2North Anna0%8.8%77.3%
Oconee-1Oconee50%70.4%92.7%
Oconee-2Oconee100%100%99.7%
Oconee-3Oconee100%100%93.4%
PalisadesPalisades0%0%0%
Palo Verde-1Palo Verde100%46.2%86.7%
Palo Verde-2Palo Verde100%100%86.4%
Palo Verde-3Palo Verde100%100%97.2%
Peach Bottom-2Peach Bottom100%70%92.4%
Peach Bottom-3Peach Bottom100%99.3%99.3%
Perry-1Perry100%98.9%98.4%
Point Beach-1Point Beach10%50.9%87.9%
Point Beach-2Point Beach100%90.9%89.2%
Prairie Island-1Prairie Island100%50.1%86.6%
Prairie Island-2Prairie Island100%100%98.6%
Quad Cities-1Quad Cities100%99.7%99.8%
Quad Cities-2Quad Cities100%98.3%88.3%
R. E. GinnaR. E. Ginna100%100%93.9%
River Bend-1River Bend10%88.6%93.8%
Salem-1Salem0%41.1%85.4%
Salem-2Salem100%98.2%90.1%
Seabrook-1Seabrook100%100%90.5%
Sequoyah-1Sequoyah100%100%96.1%
Sequoyah-2Sequoyah100%63.8%91.1%
Shearon Harris-1Shearon Harris100%100%99.7%
South Texas-1South Texas100%100%90.1%
South Texas-2South Texas100%100%97.1%
St. Lucie-1St. Lucie100%100%99.6%
St. Lucie-2St. Lucie100%99.4%84.6%
Summer-1Summer100%91.1%82.7%
Surry-1Surry100%100%90.2%
Surry-2Surry100%100%83.8%
Susquehanna-1Susquehanna100%80.8%80.4%
Susquehanna-2Susquehanna100%99.9%99.5%
Turkey Point-3Turkey Point100%100%71.4%
Turkey Point-4Turkey Point100%100%100%
Vogtle-1Vogtle100%100%88.3%
Vogtle-2Vogtle100%43.4%85.9%
Vogtle-3Vogtle100%99%91.1%
Vogtle-4Vogtle100%99.3%98%
Waterford-3Waterford0%53.6%84.5%
Watts Bar-1Watts Bar100%100%91.2%
Watts Bar-2Watts Bar0%78.2%94.2%
Wolf CreekWolf Creek100%99.9%100%

Europe — reactor output

Daily generation per unit from ENTSO-E grid data for 2026-11-28. Seven grid areas publish nuclear output at unit level; the rest of Europe does not, so coverage stops where the data does.

CountryUnitsGeneratingDaily mean outputNet capacity
France5742 (15 idle)45,608 MW62,670 MW
Bulgaria222,045 MW1,956 MW
Hungary43 (1 idle)1,461 MW1,638 MW

Units idle on 2026-11-28

Output below 10% of rated capacity. A unit sitting at a few megawatts is not generating: that is house load while the reactor is shut down, usually for refuelling.

ReactorSiteCountryDaily meanCapacity
Flamanville-3FlamanvilleFrance0.2 MW1,630 MW
Flamanville-1FlamanvilleFrance11.2 MW1,330 MW
Paluel-2PaluelFrance5.4 MW1,330 MW
Penly-2PenlyFrance42.4 MW1,330 MW
Nogent-1NogentFrance4 MW1,310 MW
Cattenom-1CattenomFrance42.4 MW1,300 MW
Cattenom-3CattenomFrance3.9 MW1,300 MW
Bugey-3BugeyFrance4.6 MW920 MW
Tricastin-3TricastinFrance27.8 MW915 MW
Blayais-1BlayaisFrance31.5 MW910 MW
Gravelines-1GravelinesFrance13.5 MW910 MW
Gravelines-3GravelinesFrance3.5 MW910 MW
Gravelines-5GravelinesFrance0 MW910 MW
Cruas-3CruasFrance35.7 MW880 MW
Chinon-B2Chinon-B2France0.1 MW870 MW
Paks-2PaksHungary0.3 MW410 MW
ReactorCountryLatest readingDaily meanCapacityOutput vs net
Belleville-1France1,292.9 MW1,293.7 MW1,310 MW98.8%
Belleville-2France1,303.1 MW1,302.7 MW1,310 MW99.4%
Blayais-1France32.1 MW31.5 MW910 MW3.5%
Blayais-2France947.6 MW947.2 MW910 MW104.1%
Blayais-3France943.1 MW943.2 MW910 MW103.6%
Blayais-4France910.6 MW911 MW910 MW100.1%
Bugey-2France899.5 MW899.3 MW920 MW97.8%
Bugey-3France0.2 MW4.6 MW920 MW0.5%
Bugey-4France893.9 MW892.9 MW900 MW99.2%
Bugey-5France901 MW899.7 MW900 MW100%
Cattenom-1France48.1 MW42.4 MW1,300 MW3.3%
Cattenom-2France1,274.9 MW1,271.4 MW1,300 MW97.8%
Cattenom-3France8.9 MW3.9 MW1,300 MW0.3%
Cattenom-4France1,255.8 MW1,255.7 MW1,300 MW96.6%
Chinon-B1France886.7 MW883.8 MW870 MW101.6%
Chinon-B2France0.1 MW0.1 MW870 MW0%
Chinon-B3France910.3 MW904.2 MW905 MW99.9%
Chinon-B4France916.1 MW914 MW905 MW101%
Chooz-B1France1,505.3 MW1,501.4 MW1,455 MW103.2%
Chooz-B2France1,510.4 MW1,510.8 MW1,455 MW103.8%
Civaux-1France1,512.7 MW1,511.2 MW1,450 MW104.2%
Civaux-2France1,491.3 MW1,489.7 MW1,450 MW102.7%
Cruas-1France922.3 MW919.7 MW880 MW104.5%
Cruas-2France858.8 MW906.2 MW915 MW99%
Cruas-3France36.6 MW35.7 MW880 MW4.1%
Cruas-4France839.7 MW558.8 MW880 MW63.5%
Dampierre-1France884.5 MW886.1 MW890 MW99.6%
Dampierre-2France933.8 MW934 MW890 MW104.9%
Dampierre-3France914.6 MW912 MW890 MW102.5%
Dampierre-4France781 MW782.4 MW890 MW87.9%
Flamanville-1France11.1 MW11.2 MW1,330 MW0.8%
Flamanville-2France1,289.3 MW1,281.6 MW1,330 MW96.4%
Flamanville-3France0.2 MW0.2 MW1,630 MW0%
Golfech-1France1,304.5 MW1,304.4 MW1,310 MW99.6%
Golfech-2France1,304.8 MW1,302.8 MW1,310 MW99.5%
Gravelines-1France13.6 MW13.5 MW910 MW1.5%
Gravelines-2France900 MW899.3 MW910 MW98.8%
Gravelines-3France3.8 MW3.5 MW910 MW0.4%
Gravelines-4France950.3 MW950.7 MW910 MW104.5%
Gravelines-5France0 MW0 MW910 MW0%
Gravelines-6France938.8 MW938.9 MW910 MW103.2%
Kozloduy-5Bulgaria1,052.4 MW1,052.5 MW953 MW110.4%
Kozloduy-6Bulgaria991.9 MW992.1 MW1,003 MW98.9%
Nogent-1France4.2 MW4 MW1,310 MW0.3%
Nogent-2France1,305.6 MW1,308 MW1,310 MW99.8%
Paks-1Hungary484.8 MW482.9 MW408 MW118.3%
Paks-2Hungary0.3 MW0.3 MW410 MW0.1%
Paks-3Hungary489.6 MW490.3 MW410 MW119.6%
Paks-4Hungary486.9 MW487.5 MW410 MW118.9%
Paluel-1France1,285.4 MW1,253.6 MW1,330 MW94.3%
Paluel-2France0.1 MW5.4 MW1,330 MW0.4%
Paluel-3France1,225.9 MW1,276 MW1,330 MW95.9%
Paluel-4France1,284.6 MW1,268.8 MW1,330 MW95.4%
Penly-1France1,329.1 MW1,325.6 MW1,330 MW99.7%
Penly-2France41.8 MW42.4 MW1,330 MW3.2%
St. Alban-1France1,317.2 MW1,317.3 MW1,335 MW98.7%
St. Alban-2France1,304.3 MW1,304 MW1,335 MW97.7%
St. Laurent-B1France889.6 MW864.3 MW915 MW94.5%
St. Laurent-B2France887.4 MW888.9 MW880 MW101%
Tricastin-1France836 MW834.9 MW915 MW91.2%
Tricastin-2France930 MW929.7 MW915 MW101.6%
Tricastin-3France28.1 MW27.8 MW915 MW3%
Tricastin-4France903 MW902.1 MW915 MW98.6%

ENTSO-E reports gross generation while the capacity figures here are net, so the last column can exceed 100% by a few per cent. That is expected and is why it is not labelled a capacity factor.

Where this data comes from

Every U.S. power reactor licensee reports its operating status to the NRC each morning. The NRC publishes the compiled figures as a daily status report covering the last 365 days. That file is a rolling window: older days drop off as new ones are added. WhereNuc archives each reading so the record keeps growing beyond what the source itself retains.

Capacity factors, outage durations and fleet averages on this page are calculated by WhereNuc from those daily readings; they are not part of the NRC file. Days with no reading are skipped rather than counted as zero, so a missing report does not look like an outage.

European figures come from the ENTSO-E Transparency Platform, where grid operators are required to publish generation per unit under EU Regulation 543/2013. Seven areas do so for nuclear: France, Spain, Czechia, Slovakia, Hungary, Bulgaria and the Netherlands. Belgium, Sweden, Finland, Switzerland, Slovenia and Romania do not publish at unit level, so their reactors are absent here even though the plants are on the map.

In Slovakia, Hungary and Bulgaria the data is reported per turbine generator rather than per reactor; WhereNuc sums the generators belonging to each unit. Where a name could not be matched to a reactor with confidence, the reading is left out rather than guessed.

NRC data is a work of the U.S. federal government and is in the public domain. ENTSO-E data is free to reuse with attribution. Machine-readable output: /api/reactor-status and /api/eu-reactor-status (add ?history=1 for the U.S. daily series). Completed outages and their durations are listed on the change log.